PCT Operational Pavement Repair 2024

Contract Number:
072084
Procurement Summary:
The Work required for this Project includes:

Milling and replacement of failed asphalt sections throughout the container yard. Milling will be completed by mechanical mills to a depth of 4-1/2" with replacement pavement placed in two lifts and finished to match adjacent paved areas.

A second potential component of the work includes the placement of concrete collars around utility basin lids. This effort will include saw cutting and removal of the existing asphalt pavement, placement of rebar and concrete in accordance with the specifications.
Notes:
No pre-bid or site visit is scheduled for this project.
Questions Due: March 27, 2024 @ 1:00 PM (PST)