Building 326 Storefront Window Replacement, Partition Bracing and Isolated Siding Painting

Contract Number:
071543
Estimated Cost Range:
Estimated cost range is $190,000 to $220,000, plus Washington State Sales Tax (WSST).
Procurement Summary:
The Work required for this Project includes: All labor and materials to complete selective demolition and disposal of existing storefront windows and sliding glass doors and abatement, as necessary, to complete selective demolition. All labor, tools and materials as necessary to install new storefront windows and sliding glass doors. The work includes all labor and material associated with Miscellaneous Carpentry, Weather Barriers, Sheet Metal Flashing and Trim, Joint Sealants and Door Hardware. The work includes all labor and material as necessary to install wall braces. Exterior painting IS NOT included in the Work. All work shall be completed in accordance with the Drawings and Project Manual in accordance with the Work Restrictions.
Notes:
Bids will be received at the Front Reception Desk, Port Administration Office, One Sitcum Plaza, Tacoma, Washington 98421 until 1:00 P.M. on April 20th, 2022, at which time they will be publicly opened and read aloud and the apparent low bid will be determined.

MANDATORY Pre-Bid conferences and site visits have been set for Wednesday, March 30th at 10:00AM and Thursday, March 31st 2:00PM. Attendance is required at only one visit. The site visit will convene at the project site.