Blair Terminal Fender System Upgrades

Contract Number:
071403
Estimated Cost Range:
Estimated cost range is $220,000 to $270,000, plus Washington State Sales Tax (WSST).
Procurement Summary:
The Work required for this Project includes the removal and disposal of thirteen (13) timber fender piles, demolition and disposal of the timber wale and chock systems, rubber fenders and associated connection hardware. The Work shall include labor, equipment and incidental materials necessary to install Port-Furnished items including: thirteen (13) timber fender piles with Contractor furnished and installed rub facings, Port-Furnished steel wale system, and Port-Furnished stay chains. The contractor shall provide all labor, tools and materials necessary for stay chain installation as shown in the Drawings and described in the Specifications. The Work includes fresh heading two (2) timber fender piles.
Notes:
Pre-bid sign in sheet posted 10.29.20, QA #1 posted 11.2.20, QA #2 posted 11.4.20, Addendum #1 posted 11.4.20, Holders List posted 11.6.20, QA#2 revised. QA #3 posted 11.10.20, Bid tab posted 11.13.20