WUT Utility Vault Upgrades
WUT Utility Vault Upgrades
Contract number:
071347
Estimated Cost Range:
$685,000 to $750,000, plus Washington State Sales Tax (WSST)
Contact:
Submit questions in writing, attention Heather Shadko.
Summary:
The Work required for this Project includes: Upgrading utility vaults in the drive aisle behind the pier at Washington United Terminal.
Work includes, sawcutting, removal of existing pavement or concrete on / around the vaults, replacement of frames and cover lids, installation of formwork / falsework and placement of reinforced concrete collar slabs around the cover lids.
Notes:
IMPORTANT- We had a issue with the Holders List, if you signed up please sign up again so that you get any updates that are posted. Specs posted 3.17.20, Holder's List posted 3.17.2020
BID DATE postponed, pre-bid will still be held-Addendum #1 posted 3.24.20, Addendum #2 posted 4.22.20, Addendum #3 posted 4.29.20. Holders List posted 5.4.20
NOTICE REGARDING PORT OF TACOMA INVITATION TO BID 071356-sealed bids must be received at the front desk of the Port Admin Office (1 Sitcum Plaza) on May 6th by 2:00pm PST. For the safety of our staff working in the building please wear masks when dropping off bids, posted 5.4.20, Bid Tab posted 5.7.20
Bids due:
May 6, 2020 - 2:00pmPre-bid due:
March 24, 2020 - 11:30amHolders list
Subscribe to the Holders List to receive all updates about this procurementDocuments
071347 WUT Utility Vault Upgrades Drawing Set 20200309.pdf
071347 WUT Utility Vault Upgrades Proj Manual and Appendices.pdf
071347 Holders List 3.17.2020.pdf
071347 Addendum 2 .pdf
071347 Addendum 1_0.pdf
071347 Addendum 3.pdf
Holder's List 071347 5.4.20.pdf
Bid Tab 071347 WUT Utility Vault Upgrades.pdf