PCT Marine Building Stairway

PCT Marine Building Stairway

Contract number: 
071255
Estimated Cost Range: 
Estimated cost range is $50,000 to $60,000, plus Washington State Sales Tax (WSST).
Contact: 

Submit questions in writing, attention Heather Shadko.

Summary: 
The Work required for this Project includes: Demolish, remove and dispose of stairway structural steel framing, guardrail and treads, furnishing and installing stairway steel framing, guard rail and aluminum grating.
Notes: 
Holders List posted 6.4.20, QA#1 posted 6.5.20, Preliminary Bid Results posted 6.16.2020, Bid Tab posted 6.17.2020, Addendum # 01 posted 6.24.2020