Wapato Creek Bridge and Culvert Removal

Wapato Creek Bridge and Culvert Removal

Contract number: 
071198
Estimated Cost Range: 
Estimated cost range is $ 800,000 to $1,000,000, plus Washington State Sales Tax (WSST).
Contact: 

Submit questions in writing, attention Heather Shadko.

Summary: 
Construction of a 70' precast voided slab bridge on 24-inch drilled shafts, demolition of a 33' temporary steel I girder bridge on spread footings, removal of existing 96" culvert earthwork, paving, utility work, stream restoration and plantings.
Notes: 
Reference docs posted 6.25.20, QA #1 posted 6/30/2020, Pre-bid sign in sheets posted 6/30/2020, Holder List posted 7.7.2020, QA #2 posted 7.9.20