Contract Number:
071421
Estimated Cost Range:
Estimated cost range is $2,200,000 to $2,500,000, plus Washington State Sales Tax (WSST).
Procurement Summary:
The Work required for this Project includes but is not limited to:
Demolition of the existing fender systems including the precast concrete fender piles, steel walers, chains, cables, and arch fenders. Installation of new fender systems that include cone fenders, UHMW-PE faced steel fender panels, chains, and anchorages. Repairing damaged concrete bullrail and water vault.
Demolition of the existing fender systems including the precast concrete fender piles, steel walers, chains, cables, and arch fenders. Installation of new fender systems that include cone fenders, UHMW-PE faced steel fender panels, chains, and anchorages. Repairing damaged concrete bullrail and water vault.
Contact:
Notes:
Holders List posted 11.23.20, QA #1 posted 11.24.20, Pre-bid sign-in sheet posted 12.1.20, Holders List post 12.4.20, Addendum #1 posted 12.10.20, QA #2 posted 12.14.20, Holders List posted 12.15.20m, Bid tab posted 12.17.20
Bids Due:
Pre-Bid Close:
Documents: