Procurement #:
062026-1038
Estimated Cost Range:
$6,000,000 to $10,000,000, plus Washington State Sales Tax (WSST)
Procurement Summary:
The Work required for this Project includes:
dredging of channel sideslope per plan; installation of dewatering faciltity, including treatment systems, at the designated transload site; overwater transportation of dredged sediment to dewatering faciltiy; on-shore material handling and dewatering; haul and dispose of dewatered sediment to a Subtitle D disposal faciltity; pre- and post-dredge bathymetic surveying; water quality monitoring; placement of post-dredge residual management cover.
dredging of channel sideslope per plan; installation of dewatering faciltity, including treatment systems, at the designated transload site; overwater transportation of dredged sediment to dewatering faciltiy; on-shore material handling and dewatering; haul and dispose of dewatered sediment to a Subtitle D disposal faciltity; pre- and post-dredge bathymetic surveying; water quality monitoring; placement of post-dredge residual management cover.
Contact:
Bids Due:
Pre-Bid Conference and Site Tour:
Questions Due:
Documents:
062026-1038_specs.pdf
(52.18 MB)
062026-1038_drawings.pdf
(53.95 MB)
062026-1038_addend_01.pdf
(145.99 KB)
062026-1038_prebid_agenda.pdf
(207.76 KB)
062026-1038_pre_bid_sign_in.pdf
(159.67 KB)
062026-1038_q_and_a_03.pdf
(111.28 KB)
062026-1038_holders_list_11-3-26.pdf
(90.48 KB)
062026-1038_preliminary_bid_tab.pdf
(92.01 KB)
american_construction_co_bid.pdf
(451.62 KB)
orion_marine_contractors_bid.pdf
(485.22 KB)
062026-1038_bid_tab.pdf
(95.24 KB)