PCT Marine Building Stairway

Contract Number:
071255
Estimated Cost Range:
Estimated cost range is $50,000 to $60,000, plus Washington State Sales Tax (WSST).
Procurement Summary:
The Work required for this Project includes: Demolish, remove and dispose of stairway structural steel framing, guardrail and treads, furnishing and installing stairway steel framing, guard rail and aluminum grating.
Notes:
Holders List posted 6.4.20, QA#1 posted 6.5.20, Preliminary Bid Results posted 6.16.2020, Bid Tab posted 6.17.2020, Addendum # 01 posted 6.24.2020