2021 Pier Repairs (Pile Cracks, Spall Repairs and Mooring Coating) - EB1, WUT and Pier 3

Contract Number:
071569
Estimated Cost Range:
Estimated cost range is $100,000 to $120,000, plus Washington State Sales Tax (WSST).
Procurement Summary:
The Work required for this Project includes:
Materials, labor and equipment as necessary to complete five concrete pile cap/edge beam spall repairs with anodes and concrete pile crack repairs with surface-applied epoxy. The work includes three Port facilities. Work shall be tracked and invoiced per facility. The Work includes mobilization/demobilization and project administration necessary to execute the Work and identified by project site. All work shall be done in accordance with project Drawings, Specifications and associated programmatic permits. The work does NOT include bollard recoating which shall be completed under a separate contract.
Notes:
Holder's List posted 11.5.21, 071569 Bid Results - Preliminary posted 11.10.21, 071569 Bid Tab posted 11.10.21